Construction loan rates and the cost of a build
Construction loan rates for an investor or builder are set deal by deal: Academy Fund weighs credit, cash/liquidity, net worth, real estate experience, property value, quality and location.2 The rate is charged only on funds drawn, so a build that moves quickly costs less to carry than one that stalls. Points at closing, the months to completion and no prepayment penalty decide the real cost of the loan.
Founded and run by military veterans.
What sets the rate on a construction loan
There is no index. The rate is set deal by deal on credit, cash/liquidity, net worth, real estate experience, property value, quality and location.22 A builder with completed projects, a realistic budget, permits in hand and a lot in a strong location prices better than a first build with a thin budget. The minimum credit score is 660.2
Leverage moves the rate. A loan at 90–95%2 of land and build cost carries more risk than one with more equity in it, and the completed-value cap of 70–75%2 is where the lender's margin lives. The rule is the lower of LTC or ARV/ACV limit.2 A lot owned free and clear counts as equity, which lowers the loan-to-cost and improves the pricing.
Interest on draws, not on the commitment
The build budget is released as draws: rehab and construction funds released as pre-agreed milestones are completed.2 Each draw accrues interest from the day it is released, and the undrawn commitment accrues nothing. That makes the schedule matter as much as the rate: a build that finishes in eight months carries far less interest than the same loan held for fourteen. An interest reserve may be required depending on credit, liquidity and experience,2 so part of the loan can be set aside to make the payments while the building produces nothing.
The four costs of a construction loan
Points
Paid at closing as a percentage of the loan, usually the largest single cost on a short build.
At closingInterest
On the drawn balance, monthly, interest-only. Principal is repaid at the sale or the refinance.
MonthlyMonths to completion
The term runs 6–24 months.2 Pick the term that fits the build and the exit, because an extension is never free, and with no prepayment penalty, finishing early is pure savings.
Closing to payoffClosing and draw costs
Appraisal of the land as-is and the project as complete, title and settlement, the lender's processing and legal fees, recording, and an inspection fee for each draw. The term sheet lists them so the comparison is on the total.
Closing and drawsWhat the calculator shows
Enter the land cost, the build cost, the completed value, the rate you were quoted and the months to completion. The calculator sizes the loan at the lower of the loan-to-cost and completed-value limits and estimates the interest over the build. It is an estimate, not a quote; the actual carry depends on the draw schedule.
When the current range is published
The current rate and point ranges for construction loans are shown on this page once counsel approves the display. Until then, every quote is in writing from a loan officer, with the rate, points, draw schedule and term spelled out. Academy Fund was founded and is run by military veterans.1
The terms
- Loan-to-cost
- Up to 90–95%2
- After-repair value
- Up to 70–75%2
- Term
- 6–24 months2
- Credit
- 660+ FICO2
- Max property value
- $5,000,0002
What it funds
- Acquisition
- Bridge
- Rehab
- Ground-up construction
- Land development
Leverage and term
These terms are general guidance. Exceptions can be made for high-net-worth or high-liquidity borrowers, or those with significant experience.5
Read next
The loan's terms, its calculator and the guides behind this page.
Rate questions
-
What is the interest rate on a construction loan?
Academy Fund publishes its current construction rate and point ranges on this page once counsel has approved how they are shown. Until then, a loan officer quotes each build in writing after reviewing the plans, the budget and the borrower. Construction rates sit above long-term mortgage rates because the lender funds a plan rather than a finished building.2 -
Do I pay interest on the full construction loan from day one?
No. Interest accrues on the drawn balance. The land funds at closing; the build budget is released stage by stage as each milestone is inspected, and each draw starts accruing when it is released. The commitment you have not drawn costs nothing in interest.2 -
How do construction loan rates compare with a mortgage?
A mortgage is a 30-year loan on a finished, occupied house, sold into a deep market. A construction loan is short, interest-only, and secured by a lot and a plan. The rate is higher for that risk, and the loan is paid off by the sale or by a long-term loan once the building exists and is leased. -
What are the points on a construction loan?
Origination points are paid at closing as a percentage of the loan. On a build of a year or less they are a large share of the total cost, so compare lenders on points, term and draw fees together rather than on rate alone. Academy Fund's point range is published once counsel approves it.
Have a deal you're working on?
Send it over, we'll take a look and give you quick feedback. A pre-qualification is not a commitment to lend.
Every figure has a numbered source
The small numbers in the text point here: loan terms come from Academy Fund.
- 01 Academy Fund Academyfund.com home page
- 02 Academy Fund Loan terms, Sep 2026
- 03 Academy Fund Internal record
- 04 Academy Fund Internal record
- 05 Academy Fund Internal record